Muller Weingarten
Unload and installation of 3 (three) DIEFFENBACHER Presses 2500-ton and 1500-ton into the MERIDIAN AUTOMOTIVE SYSTEMS facility in Celaya, Guanajuato Mexico
Phone: +52 81 8289-2200
Unload and installation of 3 (three) DIEFFENBACHER Presses 2500-ton and 1500-ton into the MERIDIAN AUTOMOTIVE SYSTEMS facility in Celaya, Guanajuato Mexico
Unload and installation of 3 (three) DIEFFENBACHER Presses 2500-ton and 1500-ton into the MERIDIAN AUTOMOTIVE SYSTEMS facility in Celaya, Guanajuato Mexico
Installation of MITSUBISHI IMM´s into the NIHON PLAST facility in El Marques, Queretaro. Mexico
Installation of 2 (two) 3500em II-470 IMM´s into the HONDA facility in Celaya, Guanajuato Mexico.
Torreon, Coah. México. Fabrication of a Waste Water Treatment System to be installed into the MOTORES JOHN DEERE facility in Torreon, Coahuila Mexico.
Apodaca, N.L. México. Fabrication of structure, tanks and conveyors for a “Quench” system
Lancaster, PE. USA. Fabrication of 1 (one) Cure Oven Structure.
Puebla, Pue. México. Fabrication and Installation of 1 (one) COnveyor System into the Supermatic plant located in Apodaca, N.L. México.
1 (one) 1100-ton STAMTEC Press transportation from Manzanillo Port to Arteaga, Coahuila. Mexico
Cienega de Flores, N.L. México. Design and Fabrication of a Paint Booth.